{"id":1263,"date":"2021-09-16T12:15:49","date_gmt":"2021-09-16T19:15:49","guid":{"rendered":"https:\/\/www.tcpm.ca\/?p=1263"},"modified":"2021-09-16T12:44:49","modified_gmt":"2021-09-16T19:44:49","slug":"445-kingsway-vancouver","status":"publish","type":"post","link":"https:\/\/www.tcpm.ca\/?p=1263","title":{"rendered":"445 Kingsway, Vancouver"},"content":{"rendered":"\n\n\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-1191 aligncenter\" src=\"https:\/\/www.tcpm.ca\/wp-content\/uploads\/445-Kingsway-Capture-2-300x145.png\" alt=\"\" width=\"300\" height=\"145\" srcset=\"https:\/\/www.tcpm.ca\/wp-content\/uploads\/445-Kingsway-Capture-2-300x145.png 300w, https:\/\/www.tcpm.ca\/wp-content\/uploads\/445-Kingsway-Capture-2-645x312.png 645w, https:\/\/www.tcpm.ca\/wp-content\/uploads\/445-Kingsway-Capture-2.png 750w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n\n\n\n<p>TCPM is currently providing project management services for 445 Kingsway, Vancouver, a 14-storey mixed use development, including two residential towers (215 rental units \u2013 2 x 12 storey concrete-framed mid-rise towers), commercial podium and underground parkade.<\/p>\n<p>Amenities include rooftop outdoor area at podium levels 2, 3 and 6, and level 14 of both towers. High-quality built outcomes aimed at meeting the Option B Low Emissions Green Buildings path of the Green Buildings Policy for Rezoning.<\/p>\n<p>Grade level landscape treatment at Kingsway and St George Street interfaces as well as 3 levels of combined commercial and residential underground parkade comprising of 224 parking stalls and 443 bike spaces.<\/p>\n<p>Scheduled for completion in 2024.<\/p>\n<p>\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TCPM is currently providing project management services for 445 Kingsway, Vancouver, a 14-storey mixed use development, including two residential towers (215 rental units \u2013 2 x 12 storey concrete-framed mid-rise towers), commercial podium and underground parkade. Amenities include rooftop outdoor area at podium levels 2, 3 and 6, and level 14 of both towers. High-quality [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":1192,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[59],"tags":[52,57],"class_list":["post-1263","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-portfolio","tag-mixed","tag-residential"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=\/wp\/v2\/posts\/1263","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1263"}],"version-history":[{"count":5,"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=\/wp\/v2\/posts\/1263\/revisions"}],"predecessor-version":[{"id":1285,"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=\/wp\/v2\/posts\/1263\/revisions\/1285"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=\/wp\/v2\/media\/1192"}],"wp:attachment":[{"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1263"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1263"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1263"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}