{"id":266,"date":"2013-04-04T11:34:34","date_gmt":"2013-04-04T18:34:34","guid":{"rendered":"http:\/\/tcsl.ca\/wp\/?post_type=portfolio&#038;p=266"},"modified":"2018-04-26T13:46:34","modified_gmt":"2018-04-26T20:46:34","slug":"vancouver-aquarium-revitalization","status":"publish","type":"post","link":"https:\/\/www.tcpm.ca\/?p=266","title":{"rendered":"Vancouver Aquarium Revitalization"},"content":{"rendered":"<p>TCPM was retained in December 2010 to manage a comprehensive multi-phased restoration of the Vancouver Aquarium.\u00a0 The challenge was to complete this step-by-step renovation and upgrading of all building systems while the Aquarium remained fully operational with little or no impact on the animals and fish, or to the visitors.\u00a0 MCMP Architects was the designer and PCL was the general contractor.\u00a0 TCPM\u2019s role was providing comprehensive project management services through all phases including program confirmation, concept, schematic and detailed design, permitting and approvals, procurement and construction phase monitoring.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TCPM was retained in December 2010 to manage a comprehensive multi-phased restoration of the Vancouver Aquarium.\u00a0 The challenge was to complete this step-by-step renovation and upgrading of all building systems while the Aquarium remained fully operational with little or no impact on the animals and fish, or to the visitors.\u00a0 MCMP Architects was the designer&#8230;<\/p>\n","protected":false},"author":4,"featured_media":577,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_kadence_starter_templates_imported_post":false,"_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[59],"tags":[52,56,58],"class_list":["post-266","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-portfolio","tag-mixed","tag-renovation","tag-special-venues"],"_links":{"self":[{"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=\/wp\/v2\/posts\/266","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=266"}],"version-history":[{"count":3,"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=\/wp\/v2\/posts\/266\/revisions"}],"predecessor-version":[{"id":899,"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=\/wp\/v2\/posts\/266\/revisions\/899"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=\/wp\/v2\/media\/577"}],"wp:attachment":[{"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=266"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=266"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tcpm.ca\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}