Jack James High School
Jack James High School was an extensive $12 million modernization project delivered to support the school’s evolving Career and Technology Studies program requirements. TCPM provided project management services for the phased renovation, which was carefully planned to minimize disruption to students and staff while maintaining school operations throughout construction.
The modernization included a renovated second-floor horticulture space, a new assembly area for the construction program, and an addition to support the autobody technology program. The project upgraded and reconfigured existing educational spaces to better align with hands-on trades and technical learning environments while improving the overall functionality of the school.


