Aldergrove Credit Union Community Centre
Completed in 2018, the approximately 170,000 sq. ft., $44 million project combines aquatics, fitness, arena, and community spaces. The facility features Greater Vancouver’s only year-round outdoor pool, an NHL-sized arena, fitness centre, indoor running track, and outdoor waterpark with waterslides, lazy river, and spray features. Designed with sustainability at the forefront, the facility incorporates mass timber construction, rainwater harvesting, solar thermal systems, and energy recovery technology.
The facility features one of Canada’s first large-scale exterior canopies constructed using dowel-laminated timber (DLT) panels, with over 15,000 sq. ft. of mass timber canopy structures installed throughout the site.


Awards
2020 BCRPA Facility Excellence Award (Projects Over $1 Million)
Awarded by the BC Recreation and Parks Association for excellence in facility design, sustainability, accessibility, and community impact.
2020 Aquatics International Dream Design Award
Recognized internationally for innovative aquatic facility design and guest experience.
2019 Athletic Business Facility of Merit Award
Presented by Athletic Business recognizing outstanding sports and recreation facilities.
2019 Athletic Business Architectural Showcase Award
Recognized for architectural excellence in recreation facility design.
2019 VRCA Gold Award of Excellence
Awarded by the Vancouver Regional Construction Association in the General Contractors category ($15M-$50M).
2019 Athletic Business Aquatic Design Portfolio Recognition
Highlighted specifically for the aquatic and outdoor waterpark design.
