North Surrey Sports & Ice Centre

June 23, 2017

TCPM is providing complete project management services to the City of Surrey for the North Surrey Sports and Ice Centre.  TCPM assisted the City throughout the Design-Build RFP, including providing the Owner’s Requirements for the RFP, assisting with short-listing proponents, and awarding the design-build contract to the Lark Group with...

Aldergrove Credit Union Community Centre

June 1, 2017

TCPM is providing project management services to the Township of Langley to design and build a new destination recreation facility in the community of Aldergrove.  The facility will include a community centre, ice arena, fitness facilities, multi-purpose spaces, elevated walking track and an outdoor waterpark.  The waterpark will feature...

Timms Community Centre Renewal

April 20, 2015

The new Timms Community Centre’s connection to the existing City Hall and Library building allows greater service integration, creates efficiencies through shared use of resources, and improves access for clients through a ‘one stop shop’ approach to service delivery. The facility is approximately 35,000 square feet including a fitness...

Ladner Leisure Centre

April 20, 2015

In February 2014, the Ladner Leisure Centre ice arena suffered a catastrophic failure when the eastern façade wall assembly collapsed to the ground.  While no injuries were sustained, arena operations immediately ceased and the Corporation of Delta took emergency action to restore the arena. TCPM was appointed to provide...

Langley Lacrosse & Basketball Arena

Langley Lacrosse & Basketball Arena, Langley Events Centre

December 4, 2013

The Lacrosse and Basketball Arena at the Langley Events Centre was implemented on a design-build fast-track basis for the Township of Langley. Situated immediately east of the Langley Events Centre (a 260,483 sq. ft. world-class facility completed by TCPM in 2009), the new building features a dedicated lacrosse arena,...

Hamilton Community Centre Addition

April 4, 2013

The Hamilton Community Centre expansion project added 5,800 sq.ft. of new construction and 2,800 sq.ft. of renovated space.  The existing community centre is adjoined to a vibrant elementary school sharing a common lobby and parking.  A growing community and a desire to create a stronger identity for the community...

Newton Wave Pool Gymnasium Addition

April 4, 2013

Turnbull Construction Project Managers Ltd. managed the addition of a new gymnasium and wrestling mat room for the City of Surrey.  This 12,500 sq. ft. facility enhanced the dry activities provided at the existing Newton Wave Pool facility. In addition to a 40’ x 80’ wrestling mat room, the...

Lakestone Resort Amenities Building

April 4, 2013

TCPM provided project management and owner’s representative services to Macdonald Development Corp for the three level and 1,200 sq. m new strata amenities building for the eight phase, 500 acre Lakestone Development in the District of Lake Country, north of Kelowna, B.C.  Situated on a challenging site on the...

North Vancouver Tennis Centre Expansion

April 4, 2013

Formerly known as the Grant Connell Tennis Centre, this 3+1 court expansion with support space is situated on a challenging site constrained by riparian areas and zero lot lines requiring a strong management of design and budget. Designed by Shape Architecture Inc., TCPM worked with DNV staff to develop...

Guildford Indoor Pool

April 4, 2013

TCPM provided project management services to the City of Surrey for the Guildford Indoor Pool, opened to the public in May 2015. The Guildford Indoor Pool is a destination recreational pool designed by Bing Thom Architects. The facility includes a 50 meter competition pool, a therapeutic area, lazy river,...

Grandview Heights Aquatic Complex

Grandview Heights Aquatic Centre

April 4, 2013

The Grandview Heights Aquatic Centre is an award winning destination facility designed by HCMA with structural engineering by Fast + Epp.  It has been on the cover and featured in Architectural Record Magazine. The facility boasts the world’s most slender, long span timber catenary roof, includes a 50 meter...

Chuck Bailey Recreation Centre – Second Floor Expansion

April 4, 2013

TCPM managed the second floor addition to the Chuck Bailey Recreation Centre for the City of Surrey.  This 7,250 sq.ft. public facility and renovation project was performed by Design-Build with Graham Construction and Engineering. Designed by CEI Architects, the expansion provided seniors groups with a fabulous new facility which includes a billiard hall, games room,...